Quality
Quality built into every stage.
From engineering review to final packing, quality is planned into the build rather than inspected in at the end.
ISO 9001:2015
Quality management systems
ISO 14001:2015
Environmental management systems

Our approach
Reviewed, inspected, tested, documented.
- 01
DFM review
Engineering review of design and assembly data before production, so issues are resolved early.
- 02
Inspection
In-process and final inspection of assembled boards.
- 03
Testing
Functional testing options, including customer-provided test procedures.
- 04
Quality documentation
QC records and approved photographs shared through the customer portal.
- 05
Production controls
Controlled processes across sourcing, assembly, packing and shipment.
Ready to bring your next design to life?
Start with your BOM and Gerber files. We'll help you take the next step toward production.

